Construction site box double door

Short Description:
Generally, it should be installed near the transformer or distribution room. If the construction site is far away from the transformer or distribution room, it is necessary to consider installing the first level box at the relative center position of the construction site's electrical machinery (without affecting material transportation and storage), in order to prepare for the next step of installing the second level box.

Write us a message

Relate Products

Chaorui Electric Co., Ltd